Zhongdian develops wind power material 2016 fee increase 2%

CLP plans to build an "offshore wind farm" off the coast of the Qingshuiwan Peninsula and promote renewable energy. The budget will cost about 5 billion to 7 billion yuan. The first step of the plan is to build a data tower in the site of the power plant in the second quarter of next year to collect environmental data such as wind and waves for feasibility studies. After completing the research report the following year, the public will be consulted and expected to start production as early as 2015. CLP has indicated that it will transfer the construction cost of the power plant to the customer. The power-up fee will be 2% in 2016. If the public opposes the project, it will consider revising the power station's model identification and site selection.

The “Offshore Wind Farm” is located within a 9 km radius of the southeastern waters of Hong Kong and Qingshui Bay Peninsula. It covers an area of ​​approximately 30 square kilometers, which is equivalent to the total area of ​​Nanji Island and Cheung Chau. CLP indicated that there will be wind turbines with different power generation capacity in the power station, 40 sets of 5 megawatt generators, and 67 sets of 3 megawatt generators. The total power generation capacity of the entire power plant is up to 200 megawatts, accounting for 1% of CLP's total power generation. It is enough to supply 80,000 households of 4 people, and it is expected to reduce emissions by 300,000 tons of carbon dioxide annually.

The 70-meter-high data tower of the 70-meter-high data tower, Lu Bochang, director of development of the company, said yesterday that it plans to build a 37-meter-high data tower to collect environmental data such as wind, waves and air pressure from the site for feasibility studies to determine the power station. The scale. The data tower will be installed from April to June next year at a cost of approximately RMB 70 million. For the first time, the “suction caisson foundation technology” will be adopted. No dredging and piling will be required, no noise will be generated or the seabed will be damaged, and wind turbines are also This technique will be used. The feasibility study is expected to be completed in 2013 and the power station will start supplying power as early as 2015.

Green power: Wind power is worthy of support Lu Pak-chang pointed out that it is estimated that 60 to 70 wind turbines will be built. If the cost of a 3 megawatt generator is about 80 million yuan to 100 million yuan, the total cost of the power farm will be about 5 billion yuan. 7 billion yuan. The relevant costs will be shared over 20 years and will be reflected in the tariff after the power station is put into operation, ie, 2% of the electricity bill will be charged in 2016. He said that the project passed the environmental assessment in 2009 and hoped that the society can reach a consensus and understand that clean energy needs to pay more. Yan Zixiang, a director of the China National Academy of Science and Technology, said that after the completion of the feasibility study report, the public will be consulted on the plan. If it is opposed by the society, it will consider revising the construction plan. “It may take a step back and change the scale of construction and even change the site selection.”

Zheng Junqi, director of Green Power Science and Nature Care, said yesterday that in the future, there will be more and more shortages of energy on Earth. Only less environmentally friendly nuclear energy can be developed, or oil can be purchased at a higher price. Therefore, if we continue to develop renewable energy resources, we will continue to Mature, production and operating prices are expected to become lower and lower, so wind power is worth supporting.

Digital Signage in Bank

Digital Signage in Bank,Signage Screen,Digital Signage Advertising,Smart Digital Signage

Guangdong Elieken Electronic Technology Co.,Ltd. , https://www.elieken.com