Energy meter installation requirements

(1) The electric energy meter and the power distribution device are usually required to be installed in one place. The front and surrounding edges of the board with the electric energy meter should be painted with moisture. The wooden board should be a solid board, and it is not suitable to use a wooden table structure. The board must be solid and dry, there should be no cracks, and the joints should be tight and flat.

(2) The electric energy meter should be installed in a place with dry, no vibration and no corrosive gas. The lower edge of the watch plate is generally not less than 1.3 m from the ground.

(3) In order to make the route of the line simple and not confusing, the electric energy meter should be installed on the left or below of the power distribution device. For the convenience of meter reading, the center of the electric energy meter should be installed 1.5 to 1.8 m away from the ground. If you need to install more than one electric energy meter, the center distance between the two tables should not be less than 200mm.

(4) The power lines of different electricity prices shall be packed separately, and the power lines of the same electricity price shall be combined with the loading table.

(5) When installing the electric energy meter, the body must be perpendicular to the ground, otherwise it will affect the accuracy of the electric energy meter.

Terminal Crimping Machine

Terminal Crimping Machine,Cable Crimping Machine,Cable Lug Crimping Tools,Electric Wire Stripping Machine

Kunshan Bolun Automation Equipment Co., Ltd , https://www.bolunmachinery.com